In the heart of Newcastle city centre, a bold new chapter in engineering education has taken shape. The Stephenson Building, Newcastle University’s teaching and research facility, brings together future-focused learning, cutting-edge laboratories, and vibrant social spaces under one striking roof.

From day one, Showcase PSR was entrusted to help bring the client’s ambitious vision to life.
Appointed under the NEUPC framework, we were responsible for designing, supplying, and installing over £1 million worth of furniture and equipment. Through every phase, we worked closely with the architect and the client, ensuring the building evolved with its users and continued to perform long after opening day.

Spanning five storeys and packed with innovation, the Stephenson Building now houses everything from immersive lecture theatres to engineering labs, design studios, and collaborative maker spaces: a true home for the next generation of problem-solvers, creatives, and inventors.

 

Scope & Services

Our partnership with Newcastle University began early. Working alongside Envision Design Group and Bowmer & Kirkland, Showcase PSR shaped an FF&E strategy that would not only support high-impact learning but also stand the test of time.

From the outset, we took a hands-on approach: modelling Revit layouts, testing space plans, running showroom tours, and presenting product options to ensure every piece was fit for purpose. We sourced from a carefully selected mix of manufacturers, including Naughtone, Casala, Connection, and Manutan, to meet the diverse needs of teaching, research, and breakout zones.

Phase One saw us deliver and install the full FF&E package across every floor of the building. This included social areas, workspaces, labs, and the signature 360° lecture theatre – a standout space designed to immerse students in new ways of learning.

Then came Phase Two. After the building opened, we returned to site to fine-tune the space based on real feedback from students and staff. We switched out chair models for added mobility, tested safer coat stand options, and refined layouts to better support how people were actually using the space. This responsive, post-occupancy support ensured that the building met full functionality requirements.

Success Points

From design intent to day-to-day use, our involvement was shaped by the goal to create spaces that genuinely serve the end-users. By staying close to the project from initial layouts to post-handover adjustments, we delivered a highly adaptive environment that responds to evolving needs for years to come.

Sustainability was built into our process. Over 80% of items were delivered direct from manufacturers to site, reducing handling, minimising storage, and cutting transport emissions.

Now open, the Stephenson Building has been embraced by the university community, with students choosing to stay and study long after lectures end. It’s a place that encourages exploration, sparks creativity, and fosters connection.

Discover more Showcase PSR projects here.

Leave a Reply